From brain to drain: How was €50m wasted on a planned IT system for Ireland’s rail network?

From brain to drain: How was €50m wasted on a planned IT system for Ireland’s rail network?

The Irish Times logoThe Irish Times

Oireachtas committees to begin investigations into cost overruns on project once called the ‘brain of the railway’ by a Government Minister